Masonry and joinery project carried out by SOGEBAT 24. The works included installation of a 3-metre wide metal gate, raising of concrete foundation piers, sandblasting and surface preparation works, and application of Tyrolean finish render. The site shows the various stages of completion, from preparation of structural elements to finishing.
Work Carried Out
Pose de portail métallique 3 mètres
Rehaussage de piles de fondation
Sablage et nettoyage des surfaces
Application d'enduit tyrolien
Préparation et mise en œuvre des éléments de structure
In the Same Category
Similar Projects
Restauration d'un muret de soutènement en pierre de taille