Interior floor renovation with geotextile membrane and stabilisation
· 2025
5 photos
The Project
Interior floor renovation project documented between March and May 2025. The works included floor preparation with stabilising fill material, installation of an impermeable geotextile membrane for waterproofing, and positioning of supports for tiling. The images show the various stages: accumulation of fill materials, laying of the protective membrane, and distribution of supports.
Work Carried Out
Décapage et préparation du sol existant
Mise en place de membrane géotextile imperméable
Stabilisation du sol avec gravats et matériaux granulaires